Technical parameters
| Working mode | can be used alone, can be used simultaneously, can be remote control and status monitoring | |||
| Applicable battery pack | 48V | 110V | 220V | 380V | 
| Charging voltage | 40~60V | 95~150V | 190~300V | 350~450V | 
| Charging current | 10~150A | 1~80A | 1~40A | 1~20A | 
| Discharge voltage | 38~60V | 80~135V | 176~270V | 300~460V | 
| Discharge current | 0-150A | 0-150A | 0-100A | 0-50A | 
| Accuracy of current | 1% | |||
| Voltage accuracy | 0.5% | |||
| Monomer voltage accuracy | 0.2% | |||
| Monomer voltage | 0.500V~16.00V(resolution 1mv) | |||
| Charge discharge time | 0 ~ 99 hours and 59 minutes | |||
| Power supply | AC:220V/380V | |||
| Cooling way | forced air cooling | |||
| Dimension | 610 x 390 x 675mm3 | |||
| Net weight | 61kg | |||
| Handling way | Industrial universal wheel | |||
| Work Environment | |
| Heat dissipation | forced air cooling | 
| Temperature | working range: -5 ~ 50℃storage temperature: -40 ~ 70℃ | 
| Humidity | relative to humidity0 ~ 90% (40±2℃) | 
| Altitude | rated altitude: 4000 m | 
| Noise | ﹤60dB | 
| Working Power Supply | |
| Voltage | single-phase three-wire system: 220V AC (- 20% ~ +30%), frequency :45 ~ 65Hz | 
| Withstand voltage test | input - housing: 2200V DC 1min | 
| input-output: 2200V DC 1min | |
| output - housing: 700V DC 1min | |
| Security | meet EN610950 | 
| Wiring | |
| AC input | Gb socket, suitable for 1 ~ 1.5mm2cable | 
| DC output | instrument 25 mm2Cable quick connect plug (red positive black negative) | 
Nickname: Battery Charge Discharge Tester; Battery Charge Tester



Features
1. Five-in-one integration of charging, discharging, single-unit detection, online monitoring and activation, with complete functions and multi-purpose functions;
2. Single-cell voltage wireless monitoring function, each wireless monitoring module can monitor 12 monomers at the same time;
3. With Chinese background analysis software, with remote control discharge function;
4. The host has a USB interface and a 2G large-capacity internal data storage space;
5. Using dual CPUs to work together to ensure the safety, reliability and accuracy of the test;
6. Pause and parameter modification can be performed during the discharge process without terminating the discharge test.


 
   
   
  
  
  
  

 

















 
                     
                     
                 
             
             
             
            